Dedication – to Miss Piggy, who takes no nonsense from frogs. Neither does Mr Dransfield and neither do I.

Other books by this author

The “Vexatious? Moi?” series:

Book 1: Harcourt Street and Vale View Primary School

Book 2: Padden Brook

Book 3: The Bent Bypass (the A555/SEMMMS Manchester Airport Relief Road)

Book 4: Sandringham Road

Book 5: Offerton Precinct

Book 6: Marple Money (the Marple Active Communities Hub)

Book 7: The Wall of Silence — How Stockport Council Blocks the Questions It Doesn’t Want to Answer

Book 8: The Foggbrook Files

Book 9: Arms Length — The Story of Stockport’s Own Companies

Book 10: For Hire — The Consultants Councils Can’t Refuse

Book 11: The Price of Civic Duty — How Stockport Council Spent While It Cut

Book 12: Paying The Piper: Stockport’s MPs And The Price Of Public Money

Book 13: Lessons In Privacy. How Stockport Grammar School Learned To Ask For Forgiveness Rather Than Permission

Book 14: Three Floors Or Four. Aquinas College, Nangreave Road. The Development No-One Living Opposite Asked For.

Book 15: Extra Large. Tesco, Tiviot Way, Portwood. The store that was built bigger than agreed, and the committee that said no.

Vexatious? Moi? Book 16: Traffic vs. Bins. Eleven Flats, No Parking Spaces, and The Hatherlow Sunday School Planning Story.

Vexatious? Toi? The Devon PFI Schools, Mr Dransfield’s Questions And Why They Were Asked.

And, outside the series:

Learning Law From a Lawless Council (Stockport) — the Michael Parnell case

Introduction

Mr Alan Dransfield’s name is now attached to the legal test for deciding whether a freedom of information request is vexatious. Most people who know the word “Dransfield” know it as a test and not as a man.

This book looks at the man’s questions. It sets out what he asked of councils, regulators and contractors about lightning protection, fire safety and the cost of private finance schools. It sets each question beside the answer he received and the record that followed.

The book includes only what can be proved from documents. Where a claim rests on his word, a Council’s word or a press report, the text says so. The courts found against him, and the book tells readers that plainly. It also records where the same courts and later events showed his questions were fair ones to ask.

The book does not say that every concern he raised was correct, and it does not hide how he sometimes expressed himself. The aim is to let readers decide whether a person who asks for a safety certificate should be treated as a nuisance.

Chapter 1: Who he is and what he asked

Chapter 1: Who he is and what he asked

Mr Dransfield describes himself as an FOI Campaigner and Social Watchdog. He lived in Devon and described on his own web pages a concern that public safety is being compromised by local authorities there, in particular through a failure to provide public buildings with adequate lightning protection and periodic lightning risk assessments.

The Upper Tribunal judge who decided one of his cases in 2020 wrote that he had achieved “some fame, or possibly in certain quarters some notoriety” in information rights. The same judge noted that his name had become inextricably associated with the Dransfield test for vexatious requests. A light-hearted 2013 post on the Information Rights and Wrongs blog credited his campaigns with giving public bodies much greater clarity on how to treat requests as vexatious.

The Court of Appeal judgment records his earlier requests to Devon County Council:

  • From February to June 2005, one request and 16 items of correspondence about “the Lafarge Concrete Scandal”.
  • From December 2005 to March 2007, three requests and six items of correspondence about safety and lightning protection at a pedestrian bridge on a private finance initiative site.
  • From January 2008 to May 2009, six requests and 18 items of correspondence about health and safety files for PFI schools and lightning protection.

The subjects are consistent: structural and fire safety in buildings that the public use, and what the public was paying for them. The Court of Appeal accepted that his May 2010 request, taken alone, was precise and politely worded. Devon, the ICO and the Upper Tribunal looked instead at the history around it. That story is the next chapter.

On 10 October 2026 Mr Dransfield wrote to the author that she was free to use his name in connection with his FOI dealings, and offered his help.

Chapter 2: The bridge request and the test case

On 29 May 2010 Mr Dransfield asked Devon County Council for the approved design drawings of the pedestrian bridge at the Exeter Chiefs rugby ground and the lightning protection test results for it. The Court of Appeal recorded that he was concerned about public safety.

Devon refused, saying the request was vexatious because of his earlier health and safety and lightning protection requests. The ICO agreed in Decision Notice FS50317322, although it also found Devon had missed the time limit. The First-tier Tribunal then ruled for him (EA/2011/0079). It found the request benign on its face and the link to his earlier requests too weak to infect it. It accepted that his earlier tone had gone beyond reasonable frustration and that he had alleged fraud and malfeasance.

The ICO appealed. On 28 January 2013 Upper Tribunal Judge Wikeley ([2012] UKUT 440 (AAC)) reversed the tribunal and held the request vexatious. He said the history showed all the hallmarks of an obsessive and unreasonable campaign lacking serious purpose. He set out four themes to weigh: the burden on the authority, the requester’s motive, the value of the request and any harassment or distress to staff.

On 14 May 2015 the Court of Appeal dismissed Mr Dransfield’s appeal. It heard the case on 27 and 28 January 2015, with Lady Justice Arden giving the only reasoned judgment. He was represented through the Bar Pro Bono Unit. The court’s reasoning has two halves.

Against him. A request polite on its face can still be vexatious in light of earlier dealings. The First-tier Tribunal’s attempt to draw a bright line between related and unrelated requests had no basis in the statute. The Upper Tribunal had found a link between his past belligerent tone and the current request, and that finding could not be challenged.

For requesters generally. Lady Justice Arden said the hurdle for vexatiousness is high because the right is constitutional. She said the starting point is a request with no reasonable foundation. Even a requester with a vengeful motive, she said, cannot be vexatious if the request seeks important information that ought to be public. She also qualified the Upper Tribunal’s account of the section’s purpose so that it applies only once vexatiousness is made out.

The Supreme Court refused permission to appeal on 14 December 2015 because the application raised no arguable point of law. Costs of £2,880 were awarded to the ICO, according to the ICO’s later letter.

The case still shapes the law. The ICO’s own guidance on section 14 cites the decision and takes its four themes from the Upper Tribunal.

Chapter 3: Six PFI schools in Exeter

While the bridge case went through the courts, Mr Dransfield’s attention was on six private finance schools in Exeter. His requests to Devon County Council, listed in the Council’s own internal review of 2013, asked for the documents a parent might expect a school to hold:

  • soil resistivity and air permeability test results for the six schools;
  • the as-built health and safety file, risk assessments, project agreement and design change order log;
  • the construction phase health and safety plan;
  • the contract with Norfolk Property Services and the maintenance costs for each school over five years;
  • the audit report and costs of remedial works to the blue water problem at the St Peter schools;
  • the lightning risk assessment for all Devon schools.

In an email received on 19 March 2013 Devon rejected eleven of these requests as vexatious or manifestly unreasonable. Its reasons, as published with the correspondence on the author’s website, were these: he had made 24 requests between 1 August 2011 and 21 March 2012, at least 19 of them on health and safety, which showed an obsession; answering would impose a significant burden; and the requests were duplicates of another applicant’s campaign.

He replied that he was not part of any campaign, that the information was held electronically and could be found in minutes, and that Devon had given two figures, eleven and 24, for his requests. The independent reviewing officer upheld Devon’s decision. The review accepted that he believed his requests had a serious purpose, such as exposing poor health and safety practice, but judged his level of contact disproportionate. It urged him to use the corporate complaints procedure instead.

Three facts in the record bear on whether his requests had a purpose:

  1. A Devon Council meeting answer from 2003, which he quoted, said the replacement PFI schools would all be fitted with sprinklers. He asked why lightning risk assessment had been left out of the same safety thinking.
  2. The Council’s 2010 to 2015 maintenance partnership with Norfolk Property Services, a document in the author’s files, says lightning risk assessments will be carried out on all Devon schools. He said no paper trail showed that they had been done.
  3. On 30 March 2011 the First-tier Tribunal (EA/2010/0152) decided that the contractor, not the Council, held a PFI school’s operations and maintenance manual, and that the Council would hold it only after the contract ended in 2033. That case clarified how FOI applies to information held by PFI contractors.

The Council’s own document makes the commitment. Whether the assessments were then done is the question his requests were asking.

Chapter 4: Mowlem, Carillion and South Bank

Mr Dransfield wrote that every PFI school built by Mowlem, later part of Carillion, should face a health and safety audit. Outside Devon, the record shows why a school-safety campaigner might ask.

South Bank Primary, Middlesbrough. Construction Enquirer reported on 13 July 2016 that Carillion would demolish and rebuild a faulty Mowlem-built PFI school at its own cost. The school opened in 2006 as part of a four-site, £155m, 25-year scheme. Cracks appeared within two years because the ground fill became saturated and expanded. Most of the foundations were found to sit on defective fill. The other four schools in the deal were problem-free. The link to Devon is his request for audits, not any finding about Devon’s schools. The Carillion volume of this series covers the contractor in detail.

Knowsley. In June 2015 Construction Manager and the Fire Industry Association reported that Knowsley Council had found fire-protection failings at all eight PFI schools built by Balfour Beatty. A kitchen fire at one school, Knowsley Park, had shown smoke spreading into an adjoining stairwell. Sixty fire dampers were installed where they could not be checked or maintained. A programme of work was agreed with Merseyside Fire and Rescue Service. Mr Dransfield quoted this report on his blog in January 2016 to support his call for national checks.

Dartington. Devon County Council’s own cabinet paper of 9 July 2014 set out remedial works at Dartington Primary, a new school of cross-laminated timber clusters. Construction Enquirer reported in September 2014 that the Council was claiming more than £7m from the contractor, Interserve, and the architect, White Design, over a leaking roof. The school was not a PFI scheme, so it shows only that Devon too had defective new schools. Construction News put its build cost at £6.1m. Totnes Today later reported that the school had been closed because of leaks and was finally demolished completely, and that the Council won an £8m pay-out after settling with the architects and contractors.

Wider pattern. After 17 Edinburgh PFI schools closed in 2016, the Cole inquiry found defective fire-stopping across them. The Sunday Post then found fire-safety defects in schools built under PFI in other Scottish councils. These were different contractors and a different country, but they show that systemic defects in PFI schools were real.

Matford Brook, 2026

Not every school in this chapter was built under PFI. Matford Brook Academy in Exeter is a free school, funded through the Department for Education and run by the Ted Wragg Trust. It is included because it is recent, local to Mr Dransfield’s Devon campaign, and shows what can follow when a public school building is not what it should be.

The building was built by ISG, which entered administration in 2024, for a reported £31 million in 2021. Its planned September 2023 opening was delayed when problems were found with the foundations. Pupils were taught elsewhere, then in temporary classrooms. The main building has never been used. On 30 June 2026 it was reported that the Department for Education had confirmed that repair was not possible and that the best option was to demolish it and start again, leaving pupils in temporary buildings until at least 2028. The Department said a review by Kier Group had found significant structural and compliance issues that would need extensive dismantling and redesign, with no assurance the building would then be acceptable. Construction News reported that ESS Modular had also entered administration. Matford Brook Academy main building to be demolished and replaced – Exeter Observer +3

Mr Dransfield’s own involvement began earlier. On 10 July 2023 Devon County Council’s Access to Information Team replied to a request he had made about the construction of the school, under reference 14886284 [confirm this is the reply he refers to, and obtain his original request]. He challenged the reply, arguing that Devon held what he called a “vicarious remit for all schools in Devon”, and asked for a review. That was his argument as a requester and not a finding of any kind. A response on Devon’s own website says the Council does not hold a list of subcontractors for the project, because the Department for Education is the client and the Council had no part in procurement. [If this is the same response, say so here. If not, say it is a separate Devon answer on the same school.] On the published record, then, the records he asked for were probably not Devon’s to give. devon

The case does not show that Mr Dransfield predicted the failure. Nothing found links the demolition decision to any gap in the health and safety file or to the documents he requested. Nor does it say anything about the six Exeter PFI schools, which have different builders, contracts and histories. Mr Dransfield says as much himself in his note on the school.

What the case does show is narrower. A request for construction and safety records, which might look technical at the time, concerned a building later found to be unfit for use. What the case does show is narrower. A request for construction and safety records, which might look technical at the time, concerned a building later found to be unfit for use. Under the Construction (Design and Management) Regulations 2015, the principal designer must prepare a health and safety file during the pre-construction phase. It must contain the information likely to be needed in any later project, such as maintenance, alteration or demolition, to keep people safe, and the client must keep it available and pass it on if the structure changes hands (regulations 12(5) and 4). Questions about what was designed, inspected and handed over matter most when something goes wrong, and by then the requester may be the only person who asked early.

Chapter 5: Vale View

In January 2013 Mr Dransfield put his safety questions to a second council, Stockport. It answered him point by point, in writing, two months before Devon refused eleven of his requests as vexatious. This chapter asks whether his Vale View questions were the kind a careful council should have been able to answer with a document.

The school and its ground

Vale View Primary School, Mill Lane, North Reddish, was formed on 1 September 2011 from North Reddish Infant, North Reddish Junior and Fir Tree Primary, and Fir Tree Nursery joined it on 1 April 2012, according to the Department for Education’s school register.

The site was not a clean one. A Department of the Environment letter of 25 November 1974 (ref PLUP4/5006/176/4) refused three applications for the same land partly because it was tipped land and unsuitable for building. A 1977 reversal by the Assistant Director of Town Planning was challenged in an Executive Meeting question on 26 April 2007, when a written answer was promised.

The stated cost rose from £5.5m in the October 2005 Statutory Proposals notice to £9.93m in a report of 22 March 2008, and was about £10m by July 2012. The cost, contamination and funding questions have their own chapters in the Harcourt Street book.

Mr Dransfield writes to Stockport

On Monday 21 January 2013 Barry Khan, Stockport’s Council Solicitor, emailed Mr Dransfield at 7.57pm. Mr Dransfield replied at 8.51pm the same evening, with the Vale View head teacher copied in.

Mr Khan’s letter lists ten emails from Mr Dransfield between 5 and 20 January. It also refers to Mr Khan’s own earlier reply of 4 January. The letter writes these dates as 2012, but the email header and the weekday show 2013.

Mr Khan re-checked whether the football pitch had been built because Mr Dransfield asked him to. Mr Dransfield asked to visit the school for a joint inspection, which he called the best way to resolve the matter. Mr Khan asked for his professional qualifications and employment, and Mr Dransfield declined to give anything beyond his name.

One ambiguity is Mr Dransfield’s own. He had asked Mr Khan to “double check if the school has been built”. Mr Khan confirmed that it had. Mr Dransfield’s annotation says he meant the football pitch.

The questions, one by one

In each case Mr Khan’s answer is relayed second-hand: he writes that he has “been informed”. What would settle each question is a document.

QuestionCouncil’s reply, 21 Jan 2013Mr Dransfield’s replyWhat would settle it
Lightning protectionInstalled to British Standards and tested 12 months after installationThe build standard BS 6651 was replaced by BS EN 62305 (2008), which requires a lightning risk assessment; he says Stockport has noneThe risk assessment, if one exists; the 12-month test certificate
DrainageAll drainage built as per the plans sent, including changes to existing outfallsThe drawings he received are “proposals only”Signed as-built drainage drawings
Pitch warning panelA warning panel is located in the schoolNo physical evidence of a control panel on site; it should be outdoors so flashing lights can be seenAn inspection or photograph of the panel and its specification
As-built drawingsThe school holds paper copies only; the Council has none on CDSays it beggars belief that they exist only on paperThe paper set, or an FOI reply confirming what is held
Gas monitoringAnswered under FOI 4873; Site Completion Report sentNo annotation on this pointFOI 4873 reply and the Site Completion Report
Risk assessments and soilSent under FOI 4436, including a report titled “Harcourt Street, Site won soil Verification”The risk assessments have not been released to himFOI 4436 reply and its list of attachments
Pond run-offPitch surface water drains to the pond via a 1983 system; Environment Agency and United Utilities were consulted (planning ref DC024357)Fertiliser from the pitch will drain into the pondThe consultation responses on DC024357; later pond reports (see below)

The answer he was given

Stockport answered Mr Dransfield point by point, in writing, where Devon’s 2013 reply refused on grounds of volume. The dispute is over whether those answers could be checked.

Mr Khan’s letter closes by asking him to reconsider how many requests he makes about the building, because answering them diverts resources. It adds that if his issues had uncovered serious concerns about construction or operation, the Council would have taken a very different view. It then points him to the corporate complaints procedure.

Mr Dransfield replied that he made repeated requests because the data he sought had not been supplied, and that nothing in the letter convinced him the issues were being taken seriously.

The pattern had a close precedent. In March 2013 Devon rejected eleven of his requests as vexatious, noted that he had made 24 requests in under eight months, called them obsessive, and urged him to use its complaints process instead. Stockport used the same two moves two months earlier: it counted the requests, then redirected him to a complaints form.

Mr Khan set himself a test: serious concerns would have changed the Council’s view. The rest of this chapter looks at what the record later showed against that test.

Two people, one label

While Mr Dransfield was writing to Mr Khan, the author’s own Vale View questions were meeting the same word. Between June 2012 and June 2013 the Council kept five of them off Executive Meeting agendas as vexatious, and the Council Solicitor’s office was involved in the advice. Dates and references are from the Council’s own letters, newest first.

DateItemWhat it shows
13 June 2013Council letter (ref JV, for the Democratic Services Manager; Corporate Director Steve Houston)A question on sport facilities fields at Harcourt Street, submitted for 2 April 2013, was ruled vexatious by the Chair and not put on 11 June 2013
19 March 2013Devon County Council to Mr DransfieldEleven of his requests rejected as vexatious or manifestly unreasonable
21 January 2013Barry Khan to Mr DransfieldPoint-by-point reply, then a request to reduce his requests
20 December 2012Letter from Jonathan ValiTwo of the author’s questions blocked from the 17 December 2012 Executive Meeting on the same basis
13 November 2012Letter from Jonathan Vali, copied to Steve HoustonThe Leader personally decided the author’s Vale View question was vexatious; it did not reach the 12 November 2012 Executive Meeting
13 July 2012Barry KhanAgain described the author’s questions as vexatious, on the day a comparable gas-affected site was evacuated (per the author’s records)
21 June 2012Council letterA third question advised vexatious by the Council Solicitor and not put to committee
January 2012ICO decision notice, case RCC0429756One of the author’s requests found vexatious; it was not taken to the Tribunal

I lost a child in a road accident. To claim my concerns regarding the traffic safety around the school were vexatious is beyond offensive to me, especially when the police complained about the situation as soon as the new school opened.police traffic.jpg

What the record later showed

Mr Khan said serious concerns would have changed the Council’s view. The later record supports several of the questions and is silent on one.

Drainage. On 10 June 2015 the Stockport Express (Helen Johnson) and the Manchester Evening News reported that Reddish Angling Club had agreed in writing to let the Council use Jackson’s Pond as an overflow for the Vale View playing fields, on condition that proper drainage was installed. The club said the drain put in was half the agreed size and did not work, and that the pond had flooded repeatedly since the school opened in 2011. It said it had spent more than £8,000 raising the bank by 18 inches and had called the fire service to pump out water. Its banking manager, Stephen Feast, said the drain was too small and always blocked, and the club threatened court action unless the Council made an offer. A Council spokesman said the Council had discussed the drainage problem with the club over recent years, had cleared roots from the pipe without solving it, and was working on a longer-term solution. Mr Khan had written in 2013 that all drainage was installed as per the plans. The Council’s 2015 statement acknowledges a drainage problem but does not say whether the installed drain departed from the plans. The signed as-built drainage drawings would.

Sports provision. Sport England’s objection was withdrawn in 2007 after the Council promised on-site facilities, and a January 2016 letter from the Department for Culture, Media and Sport said provision had been delivered and was available for community use. A 2026 phone enquiry found no public access, only a paid third-party holiday club. A public directory lists the hall and pitch for holiday-club hire at £16 a day. The sums attached to the Sport England promise and planning condition vary between different Council documents, ranging from about £625,000 to £650,000, and the author has not been able to reconcile them despite trying for over a decade. By the author’s reading of the documents, the Council has not complied with the Sport England planning condition.

Traffic. On 24 July 2007, days before the July 2007 planning decision, the Council’s highways officer Nick Whelan emailed Rob Peters of GVA Grimley that the drop-off area was inadequate, and proposed a footway and parking orders. A December 2011 police report and a 19 December 2011 Heatons and Reddish Area Committee report then recorded dangerous parking near the pedestrian access.

Capacity. The school was too small when it was planned. On 10 March 2006 an email from Chris Keebie to Andy MacKenzie, which stresses the need for confidentiality, capped the school at 525 places (“2.5 form of entry” and “no larger”, citing BB99) although the Council’s own children’s services projection (C&YPD) was 555 to 563. The same email anticipated temporary accommodation. On 28 April 2006 a Design Sub Group weighed four options and favoured a temporary classroom until the roll fell to 525. A July 2012 Executive Meeting agenda then admitted a 21.6% shortfall in North Reddish school places. A lower roll today cannot undo what officers’ own forecast said in 2006.

Lightning. No later evidence either way has been found. The question stands where Mr Dransfield left it in January 2013.

What this chapter does not claim

It does not claim that Stockport acted unlawfully, that any question was proved right, or that Mr Dransfield’s wider conduct was blameless. It claims only that his questions were specific, that each could be answered by a document, and that the Council’s answers rested largely on what it had been told. The claims that Stockport has no lightning risk assessment, that insurance would be void without one, and that the school operated in a “legal void” are Mr Dransfield’s assertions and are not relied on here.

Chapter 6: Padden Brook, the same device two decades on

The questions about Vale View began by 2006. The questions about Padden Brook began in August 2024. Both were put to Stockport Council by the author, and both met the same word.

This chapter does not claim to know why. It sets the Council’s documented steps side by side and leaves the reader to judge. The Council’s stated reason in both cases is the volume of correspondence. The author’s view, which the documents here neither prove nor disprove, is that the label was used to stop questions about the Council’s own conduct from being investigated.

Padden Brook in brief

Padden Brook, Romiley, is a wooded valley strip between Gorsey Brow and Green Lane that the author says is protected land. The Council first told her it had no protection. An email of 8 October 2024 from the Council’s Monitoring Officer, prepared by its Chief Planning Officer, then said the woodland on the western side is a Local Wildlife Site under saved policy NE1.2. It added that a 1974 refusal of planning permission shows the land was originally identified as amenity area under a 1963 permission. By the author’s account, a third protection, W1 woodland, has also been admitted. The author says the land has been cleared almost daily since 9 August 2024.

The steps, side by side

StepHarcourt Street and Vale ViewPadden Brook
Protection of the landAllocated as local open space, green chain and proposed school site; 1974 refusal as tipped land unsuitable for buildingCouncil first said no protection; later admitted Local Wildlife Site and amenity land (8 Oct 2024)
First formal use of “vexatious”The Leader personally decided a Vale View question was vexatious (letter of 13 Nov 2012)An EIR request of 2 Apr 2025 refused as manifestly unreasonable and vexatious; internal review upheld it on 1 Jul 2025
Reason givenNot stated in the author’s 2012 to 2013 letters; Stockport’s letter to Mr Dransfield (21 Jan 2013) cited the number of his requestsAbout 230 emails since 1 Aug 2024, per the internal review; “hundreds of emails over two years”, per the letter of 24 Aug 2026
Case law relied onNot recorded in the letters heldThe internal review of 1 Jul 2025 cites the Dransfield and Craven cases
Restriction on contactThe author’s account: a weekly email diversion and a bar on contacting officers directly24 Aug 2026: emails diverted to an inbox read weekly; review in six months
Who advised or decidedThe Leader decided; the Council Solicitor’s office (Barry Khan) advised (2012 to 2013)The Information Governance Manager (review, 2025); the Monitoring Officer, Vicki Bates (2026)
Outside checkICO decision notice RCC0429756 (January 2012) found one request vexatious; it was not appealedComplaint to the Local Government and Social Care Ombudsman, 24 Aug 2026

The two letters

On 1 July 2025 the Council’s Information Governance Manager upheld the refusal of the 2 April 2025 request. It cited the number of emails, the Dransfield and Craven case law, and a statement that nothing was taking place at Padden Brook that required Council action.

On 24 August 2026 the Council’s Monitoring Officer wrote to the author. She said all her FOI and EIR requests on Padden Brook were deemed vexatious and would not be acknowledged. All other communications on Padden Brook would be treated as unreasonably persistent under the Council’s Unacceptable Actions by Complainants Policy. Emails would go to a specific inbox read weekly by her or a deputy, and the restriction would be reviewed in six months. The letter cites hundreds of emails over two years and unspecified abusive and defamatory content. It also reserves the Council’s right to take legal action.

The Council’s own policy, published in April 2026, says restrictions should be a last resort, tailored and proportionate, and not a blanket approach. The author’s Ombudsman complaint argues that the 24 August 2026 letter is a blanket restriction. On 18 December 2025 the Council had already told a neighbouring resident, in a planning consultation letter, that it could not reply to or acknowledge representations because of the volume of correspondence.

The Dransfield connection is direct. The case that gave Mr Dransfield his name was the authority the Council cited against the author in 2025.

What the documents do not show

They do not show that any officer intended to stop an investigation. They show a Council, nearly twenty years apart, answering questions about land and money by counting emails. In neither case does the evidence gathered here show the underlying questions about the land being answered.

As Editor of The Romiley Gazette, when I wrote an article about the council I emailed it for their right of reply. These normal, journalistic endeavours were treated a vexatious FOIA/EIR requests.

Chapter 7: The Post Office and why FOI matters

This chapter makes one argument: freedom of information is a safety and justice tool, and the Horizon scandal shows why.

mySociety, which runs WhatDoTheyKnow, described how requesters used FOI to uncover documents in the Post Office Horizon scandal. It quotes one requester on the irony that the Government that launched Horizon was also drawing up the right to freedom of information. Between 1999 and 2015 more than 900 sub-postmasters were convicted on the strength of faulty Horizon data, according to a briefing on the scandal.

The volume of requests that followed became a problem in its own right. In June 2024 the ICO issued the Post Office with a practice recommendation. It recorded that the Post Office’s compliance rate fell to 52% in June and July 2023 and put the cause down to an overwhelming increase in requests linked to the Horizon inquiry.

The Post Office’s own 2024 responses show what a request can reach. In FOI2024/00174 it searched emails from 2003 to 2010 for correspondence mentioning Horizon and a named chief executive, and released part of what it found.

The book does not say Mr Dransfield took part in the Horizon campaign. No document in the evidence gathered links him to it. The argument is the comparison: those requesters were determined, and what they asked for turned out to matter.

Chapter 8: The label

A council can refuse a request as vexatious under section 14 of the Freedom of Information Act. The requester can then complain to the ICO and appeal to a tribunal. This chapter is about what happens when the regulator itself applies the label to the person.

The ICO letter of 15 March 2018

On 15 March 2018 the ICO’s Head of Freedom of Information Complaints and Appeals wrote to Mr Dransfield about five complaints, against the Greater London Authority, the ICO itself, the Ministry of Justice, the London Legacy Development Corporation and Cheshire West and Chester Council. The letter said the ICO would not decide any of them, because under section 50(2)(c) it considered the complaints themselves frivolous or vexatious. The reasons it gave were these:

  • His complaints to the ICO ran “well into three figures”.
  • He had refused to accept the Court of Appeal’s ruling, which he called the “Dransfield Vexatious BS Court Precedent”.
  • He had made serious, unsubstantiated allegations against ICO staff and published them to media outlets, which the ICO called defamatory.
  • He had not paid the £2,880 costs order. He had offered 50p a week, and the ICO had proposed £100 a month.

The letter said the decisions could be revisited if he paid his costs or took sustained steps to do so, and gave a written commitment to engage civilly. It told him he could seek judicial review or complain to the Parliamentary and Health Service Ombudsman.

What followed

On 13 March 2019 Mr Dransfield asked Cheshire West and Chester Council how much a councillor’s harassment claim had cost taxpayers and whether any money had been recovered. The Council refused the request as vexatious on 22 March 2019. The ICO closed his complaint on 19 July 2019 (FS50852952), citing the 2018 letter.

He appealed to the First-tier Tribunal. A registrar struck the appeal out on 1 October 2019 for want of jurisdiction. A judge reviewed that decision on 13 November 2019, amended her reasons on 17 January 2020 and refused permission to appeal on 17 January and 21 February 2020. In [2020] UKUT 346 (AAC) Upper Tribunal Judge Wikeley dismissed his further appeal on 10 December 2020.

The Upper Tribunal decision turned on a point of procedure. The ICO’s email was a notification under section 50(3)(a) that no decision would be made. Only a decision notice carries a right of appeal to the tribunal. Anyone who wants to challenge a refusal to decide must go to the High Court for judicial review. The judge noted that the ICO’s letter and the tribunal had both pointed him towards judicial review, and that the strict time limit had probably passed. He also said that whether his complaints were in fact vexatious was a separate matter that he was not deciding.

The judge added that respectable arguments for judicial review could have been made: that the ICO was operating a blanket policy and so fettering its discretion; that it was playing the man and not the ball by focusing on his conduct; and that the link to the costs order was open to challenge. No judicial review was brought.

The ICO continued to refuse his complaints on the same basis. It declined one on 6 May 2020 and another on 20 October 2020, according to the 2020 decision. An ICO decision notice of 6 June 2019 records a third party asking for information about how the ICO classified his applications. The ICO said it held some of it and withheld the rest as personal data.

The point of the chapter

The documents show a sequence. A requester is found vexatious in a case. The finding becomes the reason to decline later requests and complaints. The regulator that would otherwise check the decision declines to do so. The only route left is judicial review, which is expensive, quick to expire and unfamiliar to most people.

Chapters 5 and 6 show the same sequence at one council. At Stockport the author’s own requests were refused as vexatious, and in 2025 the Council cited Mr Dransfield’s case to do so.

Chapter 9: Anger and sarcasm

Any honest account of Mr Dransfield has to deal with how he writes. The courts and the ICO have recorded it, and a reader who learned of it only from a critic would feel misled.

What the record shows

In a 2013 case about a different appeal of his ([2013] UKUT 550 (AAC)), Judge Jacobs recorded that he had accused the ICO and the Council of “conniving and colluding to pervert the Course of Justice”. He had also said there was enough evidence to justify arresting the ICO’s lawyer and Judge Wikeley. The judge called this the kind of allegation that tribunals regularly see and regularly ignore.

It also notes that in that appeal he had only occasionally sent intemperate messages, and that his usual style was the terse, angry email.

His own web pages use capital letters for emphasis. He has compared Devon County Council in a 2013 email to a secretive Stalinist state.

What the law says about tone

The courts treated tone as evidence, not as the test. In the Court of Appeal, Lady Justice Arden said the law is not concerned with moral judgments about a requester’s motives. She said that even a vengeful requester cannot be vexatious if the request seeks important information that ought to be public. Judge Jacobs held in 2013 that striking out Mr Dransfield’s appeal for intemperate emails was disproportionate when the tribunal could simply have stopped reading them. He quoted the psychologist William James that the art of being wise is the art of knowing what to overlook.

The author’s own tone

The author’s own tone has also been put in issue. In her Ombudsman complaint of 24 August 2026 she says that, after more than a year of seeking responses on Padden Brook, she published satirical material about the Council’s handling, having given it the right to reply first. The Council’s letter of the same date refers to unspecified abusive and defamatory content. The Council has not identified which communications it means.

In the author’s words

I have campaigned with Mr Dransfield for over many years. He, like I, despises the actions of over-paid, under-skilled panjandrums who don’t care about the safety of children, the public purse or accountability in general. We are only human, after all.

Chapter 10: How the Act works, and what changed in 2025

The rules in force

Section 14(1) of the Freedom of Information Act 2000 relieves a public authority of its duty to answer a request that is vexatious. The Act does not define the word. The test comes from the Dransfield cases, which the ICO’s guidance summarises as a manifestly unjustified, inappropriate or improper use of a formal procedure, weighed against four themes: burden, motive, value and harassment or distress.

Three later rules matter.

  • Burden alone. In Cabinet Office v ICO and Ashton [2018] UKUT 208 (AAC) the Upper Tribunal held that section 14 can apply to a single request on the ground of burden. It also confirmed that an authority cannot refuse merely because it is short of resources, according to a law firm summary.
  • Cost first. The Cabinet Office’s code of practice says authorities should consider the section 12 cost limit before section 14.
  • Vexatious complaints. Under section 50(2)(c) the ICO may decline to decide a complaint it considers vexatious. There is no appeal to the tribunal, only judicial review (chapter 8).

How often the label is used

The Cabinet Office’s quarterly statistics for April to June 2026 show that, of 7,212 requests withheld in full or in part, 3% were withheld as vexatious or repeated. That is 145 vexatious and 47 repeated, against 2,166 refused on cost grounds. The bulletin sets out the figures.

The ICO does overrule authorities. In a decision notice of 9 April 2025 it held that the Cabinet Office was not entitled to treat a request for its procedures on declining internal reviews as vexatious, and ordered a fresh response.

What the 2025 Act changed

The Data (Use and Access) Act 2025 received Royal Assent on 19 June 2025. The ICO’s guidance, updated on 19 June 2026, says all of its data protection provisions are now in force. The Act turns the ICO into an Information Commission with a chair and a board. It requires only reasonable and proportionate searches for subject access requests and requires people to complain to the organisation before the ICO.

Those changes concern data protection. In the sources gathered for this book, nothing shows the Act or later legislation amending section 14 or the ICO’s handling of vexatious FOI complaints. The book should not say that FOI law changed after 2025 unless a source is found.

Sources

  • Dransfield v Information Commissioner [2015] EWCA Civ 454
  • Dransfield v Information Commissioner [2020] UKUT 346 (AAC)
  • ICO guidance: what does vexatious mean?
  • Mr Alan Dransfield, with Devon’s reply of March 2013 (sheilaoliver.org)
  • Vale View School: Khan and Dransfield correspondence (sheilaoliver.org)
  • Construction Enquirer: Carillion to rebuild PFI school after Mowlem blunder, 13 July 2016
  • Construction Manager: Knowsley fire protection failings at eight BSF schools
  • Fire Industry Association: Privately built schools plagued by fire safety issues, 8 June 2015
  • Devon County Council cabinet paper on Dartington, 9 July 2014
  • Construction Enquirer: Devon eco-school builders face £7m claim, 3 September 2014
  • Construction News: Interserve and architect face £7m claim for leaky school
  • Totnes Today: Pupils could be in new purpose-built school within months
  • Education Business: the hidden defects in passive fire protection
  • Sunday Post: flaws in fire prevention at dozens of PFI schools
  • mySociety: WhatDoTheyKnow and the Post Office Horizon scandal
  • ICO practice recommendation to the Post Office, 18 June 2024
  • ICO decision notice FS50802258, 6 June 2019
  • ICO decision notice, Cabinet Office, 9 April 2025
  • Cabinet Office FOI statistics, April to June 2026
  • ICO: The Data Use and Access Act 2025
  • DfE Get Information about Schools: Vale View Primary
  • Information Rights and Wrongs, 15 June 2013
  • ITV News West Country: New school building in Exeter, which has never been used, is to be demolished and rebuilt, 30 June 2026
  • Exeter Observer: Matford Brook Academy main building to be demolished and replaced, 11 July 2026
  • Construction News (summarised by the RPSA): ISG/ESS school building to be demolished over “significant structural issues”, 2026
  • Devon County Council, Access to Information: Matford Brook Academy response
  • Alan M Dransfield: Matford Academy, Why the Health & Safety File Matters, October 2026
  • Devon County Council, Access to Information Team, reply of 10 July 2023, ref 14886284, and Mr Dransfield’s request for review Sources:
  • isurv: Health and safety: access to files
  • NBS: What is the health and safety file?
    HSE guidance L153, Managing health and safety in construction (index) Totnes Today: “Pupils could be in new purpose-built school within months”
  • AD v Information Commissioner and Devon County Council [2013] UKUT 550 (AAC), Upper Tribunal Judge Jacobs
  • Cabinet Office v Information Commissioner and Ashton [2018] UKUT 208 (AAC), Upper Tribunal Judge Wikeley, 21 June 2018, GIA/2782/2017
  • Monckton Chambers (Berridge and Proud): summary of Cabinet Office v Information Commissioner and Ashton, Freedom of Information, vol 15, issue 1
  • Helen Johnson, “Anglers’ fury as pond deal goes down drain”, Stockport Express, 10 June 2015
  • Manchester Evening News, “Angling club threatens to take Stockport Council to court over failed promises of new drainage at Jackson’s Pond” Helen Johnson, 10th June 2015

Council letters, emails, committee papers and the author’s complaints cited in the chapters are in the author’s files.