7th November 2026
The Chief Executive, Zurich Municipal (UK)
3000 Parkway
Whiteley
Fareham
Hants
PO15 7JZ
Saturday, 07 November 2026
Stockport Council: emerging liability exposure, and a low-cost way to reduce it
Dear Chief Executive,
I write as a long-standing Stockport resident and as citizen journalist and Editor of the Romiley Gazette. I understand that Zurich Municipal is Stockport Council’s public liability insurer. I wrote to Zurich on 9 August 2026 about one site, Padden Brook. This letter widens the picture, because I believe four separate matters could produce claims, and because the same simple failure sits behind all of them: written warnings did not reach anyone who acted on them.
Everything below comes from documents I hold, and I will send copies. Where I give an opinion I say so. I am not a lawyer, I make no allegation of dishonesty against any individual, and Zurich will form its own view of liability.
1. Padden Brook, Romiley: ground stability and drainage
The Council has admitted the woodland is a Local Wildlife Site, covered by a Tree Preservation Order, and historically amenity land (a 1974 refusal cites a 1963 permission). Residents report almost daily clearance and bulldozing since 9 August 2024.
The risk is a retaining wall supporting a road and footway that serve about 24 homes. The landowner’s own letter to residents says structural engineers found tree roots undermining the wall’s footings and that, if the wall failed, the footpath and road would subside, possibly closing the road. A neighbouring outline application would remove roughly 2,000 tonnes from a slope. A geotechnical investigation about 100 yards away found soft, compressible alluvial soils. There is also a culvert beneath nearby homes and a former wire works on the site.
I asked in writing on 2 April 2025 whether the Council had investigated land instability. That request was refused as vexatious, and the Council now diverts my Padden Brook emails to an inbox read weekly. My opinion is that the Council has had notice of a foreseeable hazard, and that its own procedures have made it harder for further warnings to be heard.
2. The A555 relief road: repeat flooding
The road opened on 15 October 2018 and has been closed repeatedly by flooding, including March 2019 (about 3 million litres pumped off), July 2019, January 2021, New Year 2024/25 (closed over a week), and a further closure after Storm Claudia, reported as the fourth in two years. The Federation of Small Businesses has written to the councils about the disruption to local firms.
The Council’s own Mott MacDonald Section 19 report (25 September 2020) found shortcomings in drainage design, construction and operation, including pond outlets installed 700mm and 180mm higher than designed. In fairness, the same report concluded the road was unlikely to be a significant cause of the downstream flooding at Sandringham Road and The Demmings, and it noted that the Environment Agency’s flood map had understated the risk there. Even so, business-interruption claims, repeat emergency repairs and disputes about causation are plausible, and recovery from the original contractor may be difficult after Carillion’s collapse.
3. Mr Michael Parnell: possible claims by his family
Mr Parnell, who has since died, was known as the Stockport Town Hall protestor. Documents he left me show the Council pursued him for alleged council tax arrears of £24 while he was in intensive care. He was officially designated a vulnerable taxpayer, and the family had been on full Council Tax benefit for years. He was never given the spreadsheet that a Council letter of 31 January 2011 says was handed to him. His own handwritten reconciliation of 1998 to 2010 concluded that money was owed to him and his wife. I write on my own behalf and do not represent his family. I make no assertion about the merits of any claim, but the documents are detailed enough that Zurich may wish to consider whether his family could bring one.
4. Possible mesothelioma claims: Harcourt Street and Compstall Mill
The Harcourt Street site, where Vale View Primary School now stands, is a former tip. A 1974 refusal described it as “tipped land … unsuitable for building”. Testing reported in 2010 found lead, arsenic and brown asbestos. The Council’s contaminated land officer warned in writing that driving a gas vent through asbestos-containing fill could release fibres. The school opened in 2011 on a remediation scheme of a 400mm clean soil cover, localised asbestos removal and gas membranes.
At Compstall Mill, the Phase II investigation found elevated arsenic, lead and asbestos. I wrote to the Council on 8 July 2026 asking whether that investigation properly addressed the site’s printing and dyeing history. I have had no reply.
I know of no one who has been diagnosed with an asbestos-related disease. My concern is prospective. Mesothelioma can appear 20 to 50 years after exposure, so claims from pupils, staff, construction workers or neighbours could surface decades after the Council’s records are archived or lost. The questions for Zurich are whether fibre monitoring and exposure records exist, how long they are being kept, and which policy years would respond.
5. How simple AI-based procedures could have prevented this
In my opinion, none of these matters needed sophisticated technology to catch. Each needed a warning to be logged, tracked and put in front of a person who had to answer for it. Councils could adopt the following standard operating procedures now. In each case a named officer keeps the decision, and the AI only drafts, checks and escalates.
- Hazard-warning log. Every written message alleging a structural, flood, contamination or safety risk is acknowledged automatically, summarised, risk-rated and sent to the responsible officer with a suggested reply. The officer may override the suggestion, but must record a reason. Unanswered warnings escalate after 20 working days.
- Restriction check. Before anyone is labelled vexatious or has their communications restricted, the AI checks the decision against the Council’s own policy and lists any earlier warnings from that person that were later borne out. A senior officer not involved in the dispute signs off. Even when restricted, a person’s hazard warnings are still logged and triaged.
- Planning validation screen. At validation, the AI cross-checks the site against tree orders, wildlife designations, historic maps, culvert and watercourse records, flood maps and earlier refusals, and flags missing evidence, such as slope stability, before consultation opens.
- Contaminated land check. The AI reads historic mapping for former uses (tips, wire works, printing works) and flags any investigation that is generic rather than aimed at those uses. Asbestos and fibre-monitoring records are kept for at least 40 years.
- Enforcement ageing alert. Any enforcement case open more than six months, or with repeat complaints, is escalated to the head of service and the risk manager.
- Vulnerable-debtor check. Before debt recovery, the AI flags vulnerability markers, hospital admissions and sums smaller than the cost of collection, and a person signs off.
- Major-scheme design reconciliation. The AI compares design drawings, stated design standards and as-built surveys, and flags mismatches such as drainage outlets installed at the wrong level.
- Insurer trigger. A credible hazard that stays unresolved beyond a set period is reported to the Council’s risk manager and insurer, so a claim is prevented rather than discovered.
- Public override report. The Council publishes each year how often officers overrode the AI’s suggestions, and why.
What I ask of Zurich
Please consider whether these matters should be reviewed as potential claims and whether the Council should be asked to preserve all related records. Third, please consider promoting procedures of this kind as a risk-improvement measure across your municipal clients. I would be glad to supply the underlying documents and to meet.
Yours faithfully,
Sheila Oliver
Editor, Romiley Gazette
